Kerman
Engineering services for phase three of the right bank river training project on the Halil River- downstream of the first Jiroft Bridge
Introduction
This project involves excavation, backfilling to restore eroded gullies, construction of groynes, dry stone masonry using rubble stones, repair of gabion mesh along the right riverbank, and supply and installation of geotextile for the stabilization of the right bank of the Halil River.
BACK TO PROJECTS
CLIENT
CLIENT
Kerman Regional Water Company
LOCATIONKerman
DATE OF COMPLETION2022
Copyrights © 2017 Sazeh Pardazi Iran Consulting Engineering Corporation. All rights reserved.