Engineering Studies for Constructi on of Makran’s Intake Faciliti es
Introduction
Negin Mokran Development Petrochemical Co. (NMPC) has decided to develop a third hub of Petrochemical Industries in Chabahar Free Trade-Industrial Zone.
Based on detailed investigation, 1,200 hectares of Chabahar Free Trade- Industrial Zone with dimensions of 2.7 × 4.4 Km has been allocated for petrochemical zone.
Mokran Abniroo company "MAN" (a sub-company of NMPC), is willing to initiate the construction process of "Sea water Intake of MOKRAN Petrochemical Complex- Phase I" Project.
Delta Offshore Technology is appointed as EPC contractor of basic design endorsement, detail design engineering, procurement, construction/installation and commissioning facilities of the seawater intake system and SPI is appointed to do Engineering studies
CLIENT
Delta Co
LOCATIONIRAN-Sistan and Baluchistan Province- Chabahar
DATE OF COMPLETION2021-2023